Short Lead Time for Loader Heavy Equipment - China hot XCMG small Excavator XE15 – Chengong
Short Lead Time for Loader Heavy Equipment - China hot XCMG small Excavator XE15 – Chengong Detail:
Optional Parts
Standard configured hydraulic breaker pipes are provided, with optional breaker equipment available.
Popular Models
XCMG XE15 is the most popular model of China 1.5T excavator for sale.
Our Service
* Warranty: We supply one year warranty for all the machines we exported, during the warranty, if there is problem caused by machine quality without improper operation, we will supply the replace genuine parts by DHL to clients freely to keep the machine in high efficiency work.
* Spare Parts: We have 7years experience on machine and spare parts supplying, we are efforts to supply Genuine brand spare parts with good prices, quick response and professional service.
Parameters
Model | Unit | XE15 | |
Operating weight | kg | 1640 | |
Standard bucket capacity | m³ | 0.044 | |
Engine | Engine Model | / | 3TNV82A |
Direct injection | / | √ | |
Four strokes | / | √ | |
Water cooling | / | √ | |
Turbo charged | / | × | |
Air to air intercooler | / | × | |
No. of cylinders | / | 3 | |
Rated power/speed | kw/rpm | 16.5/2200 | |
Max. torque/speed | N.m | 86.5/1320 | |
Displacement | L | 1.33 | |
The main performance | Travel speed | km/h | 4.4/2.4 |
Swing speed | r/min | 11 | |
Max. gradeability | / | 30° | |
Ground pressure | kPa | 23.8 | |
Max.Bucket digging force | kN | 13.9 | |
Max.arm crowd force | kN | 8.8 | |
Main pump | / | Japan nachi | |
Hydraulic system | Rate flow of main pump | L/min | 2×19.8+14.1 |
Max pressure of prime relief valve | MPa | 24 | |
Max pressure of travel system | MPa | 21 | |
Max pressure of swing system | MPa | 18 | |
Max pressure of pilot system | MPa | 3.3 | |
Fuel tank capacity | L | 20 | |
Oil capacity; | Hydraulic tank capacity | L | 29 |
Engine lubrication | L | 5.5 | |
A Overall length | mm | 3760 | |
Overall dimensions | B Overall width | mm | 1080 |
C Overall height | mm | 2400 | |
D Overall width of upperstructure | mm | 1080 | |
E Track length | mm | 1578 | |
F Overall width of undercarriage | mm | 1080 | |
G crawer width | mm | 230 | |
H Dozer black(width/height) | mm | 1080×225 | |
I Tumbler distance | mm | 1217 | |
J Crawer gauge | mm | 850 | |
K Clearance under counter weight | mm | 472 | |
L Ground clearance | mm | 180 | |
M Min.tail swing radius | mm | 1190 | |
A Max. digging height | mm | 3615 | |
Working range | B Max. dumping height | mm | 2480 |
C Max. digging depth | mm | 2320 | |
E Max. vertical wall digging depth | mm | 1520 | |
F Max. digging reach | mm | 3915 | |
G Min. swing radius | mm | 1675 | |
H Max.dozer lifting height | mm | 220 | |
I Max.dozer cutting depth | mm | 240 | |
Angle of arm deflection | Degree | 70/50 |
Product detail pictures:
Related Product Guide:
Sticking to the perception of "Creating products of top of the range and earning mates with people today from all over the world", we constantly put the desire of consumers in the first place for Short Lead Time for Loader Heavy Equipment - China hot XCMG small Excavator XE15 – Chengong , The product will supply to all over the world, such as: Cape Town, Jordan, Marseille, We provide good quality but unbeatable low price and the best service. Welcome to post your samples and color ring to us .We will produce the goods according to your request. If you are interested in any products we offer, please feel free to contact us directly by mail, fax, telephone or internet. We are here to answer your questions from Monday to Saturday and looking forward to cooperating with you.
By Mamie from Slovak Republic - 2017.11.12 12:31
Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
By Elsa from Bulgaria - 2017.11.29 11:09
Write your message here and send it to us