Short Lead Time for Loader Heavy Equipment - China hot XCMG small Excavator XE15 – Chengong
Short Lead Time for Loader Heavy Equipment - China hot XCMG small Excavator XE15 – Chengong Detail:
Optional Parts
Standard configured hydraulic breaker pipes are provided, with optional breaker equipment available.
Popular Models
XCMG XE15 is the most popular model of China 1.5T excavator for sale.
Our Service
* Warranty: We supply one year warranty for all the machines we exported, during the warranty, if there is problem caused by machine quality without improper operation, we will supply the replace genuine parts by DHL to clients freely to keep the machine in high efficiency work.
* Spare Parts: We have 7years experience on machine and spare parts supplying, we are efforts to supply Genuine brand spare parts with good prices, quick response and professional service.
Parameters
Model | Unit | XE15 | |
Operating weight | kg | 1640 | |
Standard bucket capacity | m³ | 0.044 | |
Engine | Engine Model | / | 3TNV82A |
Direct injection | / | √ | |
Four strokes | / | √ | |
Water cooling | / | √ | |
Turbo charged | / | × | |
Air to air intercooler | / | × | |
No. of cylinders | / | 3 | |
Rated power/speed | kw/rpm | 16.5/2200 | |
Max. torque/speed | N.m | 86.5/1320 | |
Displacement | L | 1.33 | |
The main performance | Travel speed | km/h | 4.4/2.4 |
Swing speed | r/min | 11 | |
Max. gradeability | / | 30° | |
Ground pressure | kPa | 23.8 | |
Max.Bucket digging force | kN | 13.9 | |
Max.arm crowd force | kN | 8.8 | |
Main pump | / | Japan nachi | |
Hydraulic system | Rate flow of main pump | L/min | 2×19.8+14.1 |
Max pressure of prime relief valve | MPa | 24 | |
Max pressure of travel system | MPa | 21 | |
Max pressure of swing system | MPa | 18 | |
Max pressure of pilot system | MPa | 3.3 | |
Fuel tank capacity | L | 20 | |
Oil capacity; | Hydraulic tank capacity | L | 29 |
Engine lubrication | L | 5.5 | |
A Overall length | mm | 3760 | |
Overall dimensions | B Overall width | mm | 1080 |
C Overall height | mm | 2400 | |
D Overall width of upperstructure | mm | 1080 | |
E Track length | mm | 1578 | |
F Overall width of undercarriage | mm | 1080 | |
G crawer width | mm | 230 | |
H Dozer black(width/height) | mm | 1080×225 | |
I Tumbler distance | mm | 1217 | |
J Crawer gauge | mm | 850 | |
K Clearance under counter weight | mm | 472 | |
L Ground clearance | mm | 180 | |
M Min.tail swing radius | mm | 1190 | |
A Max. digging height | mm | 3615 | |
Working range | B Max. dumping height | mm | 2480 |
C Max. digging depth | mm | 2320 | |
E Max. vertical wall digging depth | mm | 1520 | |
F Max. digging reach | mm | 3915 | |
G Min. swing radius | mm | 1675 | |
H Max.dozer lifting height | mm | 220 | |
I Max.dozer cutting depth | mm | 240 | |
Angle of arm deflection | Degree | 70/50 |
Product detail pictures:
Related Product Guide:
carry on to further improve, to guarantee merchandise high-quality in line with market and buyer standard necessities. Our organization has a top quality assurance procedure have already been established for Short Lead Time for Loader Heavy Equipment - China hot XCMG small Excavator XE15 – Chengong , The product will supply to all over the world, such as: Cyprus, Nicaragua, Moldova, We maintain long-term efforts and self-criticism, which helps us and improvement constantly. We strive to improve customer efficiency to save costs for customers. We do our best to improve the quality of product. We will not live up to the historic opportunity of the times.
By Caroline from Austria - 2017.09.09 10:18
Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
By Ann from Malawi - 2018.12.30 10:21
Write your message here and send it to us